Project Overview
This project provided boarding accommodation for 108 girls and eight members of staff across two houses, Rubens House to the North and Pitt House to the South.






The two interconnected houses contain distinctly different, but complementary, characteristics.


The houses were built to encourage collaboration.
The houses, which are arranged over four-storeys, also contain a drawing room, MONS room, rumpus room and kitchen for each house along with study spaces for every girl including day boarding girls and shared music practice rooms.
Core Team

Gary Wykes
Project Director
Gary started his construction career at 16 as a Trainee Quantity Surveyor, combining hands-on experience with studies at Kettering and Northampton Colleges, where he earned ONC and HNC qualifications. He later obtained a part-time degree from Nottingham Trent University, completing it in five years thanks to his prior qualifications.
In the mid-1980s, Gary worked with a second company, managing projects in Hatfield and Aylesbury, before seeking a role closer to home. Joining SDC in the late 1980s, he progressed from Quantity Surveyor to Senior Quantity Surveyor and then Manager of the Special Projects Division. During the early 1990s recession, Gary played a key role in restructuring the division, which focused on smaller-scale projects. This effort helped position SDC for long-term success in a challenging economic climate.
Appointed to SDC’s Board of Directors in 2003, Gary oversees the Special Projects Division, manages key projects, and contributes to strategic and financial planning. Between 2004 and 2007, he played a role in transitioning SDC to an Employee Benefit Trust (EBT), ensuring stability and employee-centred governance. His leadership alongside the other Board Directors has been pivotal in navigating challenges and ensuring stability.
Gary has fostered enduring relationships with major clients like Jaguar Land Rover and the University of Cambridge, emphasising quality and client satisfaction. Over decades, he has supported SDC’s evolution from a more informal operation to a professional, structured organisation. As the company continues to grow and adapt, he remains committed to supporting its ongoing success and ensuring it is well-positioned to meet future challenges.

Luke Norris
Project Manager

Raymond Renkel
Construction Manager

Marc Huggins
Services Project Manager

Jonathan Richardson
M&E Manager
After completing his A-Levels in Nottingham, Jonathan pursued an engineering apprenticeship at Leeds College of Building. This block-release programme integrated theoretical study with hands-on experience, enhancing his technical skills and problem-solving abilities. During his apprenticeship, he worked with a national MEP contractor, which gave him valuable industry exposure but ultimately highlighted his preference for a more collaborative and people-focused work environment.
A significant shift in Jonathan’s career occurred when his mentor invited him to join a regional family-owned MEP contractor in Nottingham. The role suited his collaborative working style, but the company later faced financial challenges during a recession, prompting him to explore new opportunities.
Having already collaborated with SDC as a subcontractor, Jonathan’s skills drew the attention of the company’s M&E Director. After his former employer’s closure, he joined SDC and was soon entrusted with leading its newly created M&E self-delivery department. Over 18 months, he assembled a team of professionals with subcontractor expertise, building a department now comprising 20 members, including trainees and project managers. This team operates with a focus on technical excellence and practical problem-solving.
In 2016, SDC supported Jonathan during a challenging period in his personal life. Faced with extensive travel demands and an expanding family, he raised his concerns with the company, which facilitated his relocation closer to its base. This adjustment improved his work-life balance and reinforced his commitment to the company.
Jonathan became a Director in January 2024. In this role, he is responsible for project delivery, tendering, preconstruction, and sustainability efforts, alongside overseeing the MEP department. His contributions have been integral to the successful delivery of complex projects in sectors such as Formula One, including work with clients like Aston Martin and Red Bull. He values the variety and problem-solving aspects of his role and is committed to fostering a culture of collaboration and continuous improvement within SDC.

Matt Wells
Planning Manager

Eddie Somekh
M&E Commercial Manager
Eddie joined SDC in 2013 and is an accomplished construction professional. He has advanced from Quantity Surveyor to Contract Surveyor and now holds the role of Commercial Manager in the Services department. Eddie manages sub-contractor accounts, coordinates project costs, and oversees self-delivery projects from inception to completion. He has a broad range of experience within different sectors, with projects ranging from the construction of student accommodation to state-of-the-art flexible workspace laboratories.

Fircroft & Fairleigh School Boarding House Refurbishments
This project entailed the refurbishment of two historic boarding houses at Uppingham School.