Projects
Creating inspiring spaces through innovative design and construction

St Edmund Hall
The project comprises the demolition of existing buildings and construction of new student accommodation buildings.

1000 Discovery Drive
A versatile five-storey multi-occupancy structure, offering approximately 105,000 square feet of office and B1(b) laboratory space within the Cambridge Biomedical Campus.

Lucy Cavendish College
This scheme provides 72 eco-friendly and modern en-suite bedrooms for students studying at Lucy Cavendish College.

Univ North Development
The Univ North Development is an ambitious student accommodation project.

Central Spaces
This project provides modern and integrated facilities for St Catherine's College.

Brickstone House
The refurbishment of Brickstone House was designed to modernise the building by enhancing both its functionality and aesthetics.

Dorothy Garrod Building
This project involved the demolition and partial demolition of the Strachey and Fawcett buildings, with a four-storey student accommodation building constructed in its place.

The Optic
The Optic’ provides 95,000 sq ft of flexible workspace and state-of-the-art laboratories, adjacent to the recently completed ARM HQ building.

Unit 1-21
Buildings 1 and 2 provide R&D and office space for technology businesses at Cambridge Science Park.

One Granta
One Granta represents a pioneering venture, boasting a cutting-edge speculative laboratory and office edifice.

Whittle Lab
The New Whittle Laboratory, a £58 million facility, will be the leading global centre for net-zero aviation and energy.

Unit 22-25
Units 22-25 add to SDC’s ever-growing portfolio of R&D facilities at the world-renowned Cambridge Science Park.

XR Studio
The XR studio project for the Open University, the UK's largest academic institution, involved the comprehensive refurbishment of two underutilised spaces.

Project Zeta
One of the UK’s leading science and innovation campuses, and home to over 200 global organisations.

Babraham R&D 2
The Babraham Research Campus aims to be one of the leading centres for bioscience excellence.

Babraham R&D 2B
Babraham R&2B provides a dynamic environment where discovery and research come together.

Brooklands
Brooklands sustainable business campus represents aims to meet the needs of tech businesses while prioritising sustainability and collaboration.

ZF Office and Technical Centre
SDC was appointed to deliver a new high specification Technical Centre and Office building for automotive company, ZF Shirley.

NIAB East Malling Research (EMR)
This project for NIAB EMR involved a site-wide redevelopment at their East Malling Site to enhance the company’s current operations and improve the working conditions for the employees at the site.

NIAB Park Farm, Barns 1 & 2
Barns 1 and 2 for NIAB are designed to provide a mixture of laboratories, offices, and controlled sporeproof growth rooms.

Northampton College
The redevelopment of Booth Lane saw the demolition of the former campus and the construction of a single ‘landmark’ building with associated ancillary development in its place.

The Bradfield Centre
The Bradfield Centre has been designed to encourage collaborative working and innovation.

Quad One
A linear block that comprises three-storeys of accommodation for small and medium enterprises.
Quad Two
Quad Two is the second landmark building to be constructed by SDC on the Harwell Science and Innovation Campus.

Kettle’s Yard Museum
Kettle’s Yard is an art gallery set within four converted Grade II listed cottages.

Fircroft & Fairleigh School Boarding House Refurbishments
This project entailed the refurbishment of two historic boarding houses at Uppingham School.

Barton House
The construction of Barton House provides Abingdon Science Park with a new laboratory and office building.

Civil Engineering Building
This project involved the construction of a three storey building for the Civil Engineering department at the west Cambridge campus.

Faringdon Lodge
Faringdon Lodge is a three-storey entrance building that contains teaching and support spaces for the Economics and Computer Science Departments.

Science & Maths Building
SDC constructed a new wing containing twelve dedicated Science classrooms and five maths classrooms for Kimbolton School.

Wycombe Abbey School Dormitories
The project provided boarding accommodation for 108 girls and eight members of staff across two houses.

Cokethorpe Changing Pavilion
Cokethorpe School’s new changing pavilion is of timber frame construction, clad in timber panels and finished with a green roof.

Harrison Drive Nursery
This project created a contemporary 650 sq.m nursery for Homerton College in Cambridge.

Project Gemma
Project Gemma represents a state-of-the-art expansion of the Addenbrooke’s Clinical Research Centre.

Christ Church College
This project for Christ Church College in Oxford comprised two parts, namely the beautiful refurbishment and restoration of the Blue Boar Quadrangle and the conversion of a seventeenth century brew house.

Classic Cars
The development of this 14,000 sq.m. state-of-the-art facility allowed all of Jaguar Land Rover’s Classic operations to be consolidated under one roof.

Capacity Uplift
This project for Jaguar Land Rover involved the construction of two industrial buildings, totalling 64,000 sq.m. in Castle Bromwich.

Cowan Court
Cowan Court is a three-storey student accommodation building with curved elevations.

Bittesby House Refurbishment
The complete refurbishment of the 1828 Georgian Style Bittesby House and the Kennels Building in Lutterworth.

Richardson Building
Located on the Cambridge Science Park, this project comprised the construction of a modern four storey development.

Battery Test Facility
This newly established facility equips Jaguar Land Rover with a cutting-edge venue for testing electric vehicle batteries.

ARM 1
SDC successfully completed the refurbishment of ARM 1, a two-storey office building, to align with the ARM Cambridge Campus design standards.

ARM CPC1
Arm CPC1 involved the ground floor fit-out of a three-storey building to create modern open plan offices and laboratories.

Curium Pharmaceutical
Curium Pharmaceuticals initiated a refurbishment project at Churchill Hospital in Oxford to prepare the existing building for the installation of Cyclotron equipment.

The Wolfson Building
Forming part of the John Radcliffe Hospital complex in Oxford, these two rectangular forms provide purpose-built facilities for the Wolfson Centre.

Westway Place Student Accommodation and Mixed Use
This block provides one-hundred and eighteen studio apartments for Oxford Brookes University students.

Project Hadar
Project Hadar involved the refurbishment and re-configuration of the four-storey Gleeson building in Cambridge.

Sidgwick Lecture Block
SDC was tasked with undertaking a simple refurbishment of the Grade II listed lecture block.

SVO Ryton
This project comprised the design and conversion of an existing warehouse building into a new Special Vehicle Operations venue for Jaguar Land Rover.

University Sports Centre
The University Sports Centre in West Cambridge was instrumental in enhancing the University of Cambridge’s sporting infrastructure.

Simon Sainsbury Centre
This project involved a four storey extension to the old Addenbrooke’s Hospital Building in the heart of Cambridge.

Cummins Link Block & PV Substation
This scheme comprised the full demolition and strip out of the old toilet blocks and occupational health suite at Cummins Link Block and PV Station.

Hangar 1 & Milestone Building
In preparation for the RAF’s centenary celebrations in 2018, SDC was tasked with refurbishing Hangar 1 at the RAF Museum in Hendon.

Cranfield United Football Club
This project for Cranfield Parish council provided a new 3G football pitch and sports pavilion.

Project Atlantis
This scheme for Center Parcs in Sherwood included the installation of the Tropical Cyclone water ride, the largest interactive four-person raft ride in Europe.

New Court
The refurbishment of Trinity New Court, Cambridge, entailed the substantial upgrade of the internal and external fabric to reduce energy consumption and carbon emissions by 75% and 88% respectively.

Bletchley Leisure Centre
This leisure centre was completed as part of the Bletchley town centre regeneration scheme.

The Welding Institute
A comprehensive redevelopment of The Welding Institute’s site to create a series of new structures connected to the main Bevan Braithwaite building via a link street.

Museum of Archaeology & Anthropology
This refurbishment involved stringent design criteria for temperature and relative humidity.

Whipsnade Zoo
This project for Whipsnade Zoo involved the demolition of an existing entrance building to make way for a new, fresh and inviting entry point for visitors.

Beech Court
This project for Abingdon School provided space for the sixth form and art department.

Grove Theatre
This negotiated project provided a major regeneration boost to the heart of Dunstable.

People Performance Centre
The People Performance Centre is a state-of-the-art fitness centre at Mercedes facility in Brixworth.

Regional Surge Centre
Design and construction works for a new 60-bed regional Surge Centre and two Nightingale Wards for Addenbrooke’s Hospital.

Flitwick Leisure Centre
SDC constructed the modern centre which includes an 8-lane pool and other amenities to serve the expanding community.

Quarry Theatre
This project involved the renovation and conversion of the Grade II listed chapel into a 300 seat galleried theatre.