Project Overview

This leisure centre was completed as part of the Bletchley Town Centre Regeneration Scheme. The centre featured a 25m competition pool with wet and dry facilities, a multi-use sports hall, indoor bowls rink, four squash courts, an extensive fitness suite, catering facilities and a multi-storey car park.

Project Value
£21,600,000
Project Value
Sustainability Features
BREEAM ‘Excellent’
Sustainability Features
Leisure Space
10,000m²
Leisure Space
Logistics
Occupied Site
Logistics
Award
Considerate Constructors Bronze Award
Award
Completion Date
June 2010
Completion Date

The design of the roof was a unique feature and a notable focal point for the centre.

The curved structures of the pool hall provided a new visual dynamic while maximising natural daylight.

A multi-storey car park was constructed simultaneously and featured a concrete frame with timber cladding spanning the four levels.

A wide range of renewable technologies were included to improve the energy efficiency of the building.

Features included water harvesting and biomass heating. These aspects helped the venue win the  National BREEAM Bespoke Award in recognition of its Excellent rating – the first leisure centre in the world to achieve such a feat.

Paul Sanders, Milton Keynes Council

“A sound partner to work with who has a significant eye on the detail of the finished product and key performance, quality management and project management abilities that mean that I would not hesitate to use this firm again and I would recommend them unreservedly.”