Project Overview

Faringdon Lodge acts as an entrance gateway to Abingdon School, welcoming those who arrive and helping to establish the identity of the School and the values it represents.

Project Value
£4,380,000
Project Value
Key Features
Bespoke Reception Desk
Key Features
Educational Facilities
11,380 sq.ft
Educational Facilities
Logistics
Eynsham Depot
Logistics
Location
Abingdon
Location
Completion Date
June 2020
Completion Date

The building was designed to complement the architecture of the school.

The red brick and zinc standing seam roof of the neighbouring Yang Science Centre were replicated on Faringdon Lodge, while the colonnades at ground level and the first-floor terrace provide depth to the facade.

The bricks echo the landscape of the sports pitch opposite. Complementing black bricks and dark mortar are used around the ancillary areas to the rear of the building, with the intention that climbing plants will cover them, further blending into the adjacent landscape.

Internally, the ground floor boasts a spacious reception area with a central bespoke oak desk and feature timber ceilings.

The first floor comprises two upgraded sixth form house rooms (or Common Rooms) named after teachers at the school. Both sides, O’Donnelly’s and O’Doherty’s, have kitchenettes, Heads’ offices, study areas and breakout/lounge spaces with entertainment in the form of TVs and foosball tables.

The building has several pioneering innovations that improve the overall user experience.

There are automatic ventilation dampers on the north side of the building which provide free heating and cooling and the 1st floor terrace has an invisible glass smoke screen to channel smoke out of the building, stopping it spreading to the other side in the event of a fire.

Further to this, and to meet with the client requirement, the balconies and terraced areas utilise a channel drainage system to maintain the slim profiles of their build up. The 1st and 2nd floor terrace have a complex gravity fed drainage system using Schlüter Ditra drain and adjustable channels set to falls. Installed under the tiles, any rainwater is channelled to the drain which has holes both on top and at the sides. This system ensures the 1st and 2nd floor soffits are completely waterproof.

Core Team

Andrew Clark

Andrew Clark

Commercial Manager

Andrew has worked at SDC since 1995 and is one of the longest serving members of the company, where he has progressed to Project Commercial Director. He is a valued and trusted member of the team with significant industry experience. Andrew has contributed to a vast range of projects across Oxford and Cambridge, where he is responsible for providing commercial leadership, strategic commercial direction and support to the project team.

Richard Smith

Richard Smith

Quantity Surveyor

Richard joined SDC in 2013 and has since progressed from Quantity Surveyor to Commercial Manager, becoming a valued and highly professional member of the commercial team. He is an integral part of the site strategy team, where his expertise is key to ensuring seamless operations and efficient cost management.
Raj Parmar

Raj Parmar

Second Stage Leader

Since starting with SDC in 2013, Raj has proven himself to be an accomplished Pre-Construction Manager with a wealth of construction knowledge. Raj’s responsibilities include the overall management of the pre-construction process and assuming the pivotal role of client liaison throughout the whole of the project. With over two decades at the company, Raj is a well-respected member of the team who has worked and a huge variety of projects for a range of sectors including education, leisure, and science and technology.