Project Overview

One Granta is a cutting-edge speculative laboratory and office building spanning approximately 125,000 sq.ft, crafted to shell and core standard and enhanced by essential infrastructure.

Project Value
£35,000,000
Project Value
Sustainability Features
32 Electric Vehicle Charging Stations
Sustainability Features
Cutting edge laboratory and office space
125,000 sq. ft
Cutting edge laboratory and office space
Logistics
Caxton Depot
Logistics
Location
Cambridge
Location
Completion Date
September 2024
Completion Date

One Granta is situated on a prominent pitch at the entrance to Granta Park, a prestigious science and technology location in Cambridge.

The structure comprises of post-tensioned concrete slabs and a steel frame for the roof, supporting the building’s curtain walling system and GRC fibre cements façade rainscreen cladding panels.

The project also consists of PPC finishes aluminium framed windows and profile aluminium rainscreen cladding. Internally, a central core and timber-lined shared reception area enable the flexible and highly efficient design to accommodate a single or double tenancy per floor. A central lift lobby provides sufficient lifts and stair access. Toilets, showers, lockers, a disabled toilet and necessary M&E provisions were also included in the works.

The scheme was devised to consider WELL Enabled, BREEAM, and WiredScore class leading certifications.

Conscious of environmental, social, and governance (ESG) principles, One Granta was designed to have state-of-the-art sustainability features, including 32 electric vehicle charging stations, with provision for expansion to 156, and ensures a minimum 25% reduction in carbon emissions.

Sustainability is further enhanced by renewable technologies, such as air source heat pumps and rooftop photovoltaic array. The structure also boasts a full-length third-floor terrace, with outstanding views over Granta Park’s central green and beautiful countryside surroundings.

Core Team

Carl Bennett

Carl Bennett

Board Director

Carl’s career in the construction industry began in 2004 when he joined SDC. Starting in a hands-on role, which later became the blueprint for the SDC Management Trainee Scheme, Carl gained extensive experience across various sectors, including gymnasiums, swimming pools, care homes, and large-scale science buildings. His diverse project involvement included Site Management, Contract Management, and project direction, which helped him develop a comprehensive understanding of the construction process.

In the early years, Carl contributed to projects such as the Sharnbrook School science block, Cardington Court care home, and a road project in Solihull. Despite the challenges of tight margins and economic pressure during the recession, he demonstrated exceptional problem-solving skills, managing complex logistics and leading teams to deliver projects successfully.

A pivotal moment in Carl’s career came in 2012 when he was appointed Construction Manager for a £20 million project at Admiral Insurance in Newport, Wales. Leading a team to deliver three floors of office space ahead of schedule, the SDC team were recognized with the prestigious Admiral Supplier of the Year award. This success propelled him through further leadership roles, including Contracts Manager and ultimately Board Director.

As a Board Director at SDC, Carl oversees key departments such as pre-construction, sales, estimating, and IT. His strategic input has been instrumental in modernising company operations, particularly through digitising processes and improving internal systems. Known for his methodical approach to project management, Carl ensures projects are delivered on time, within budget, and to the satisfaction of clients.

Throughout his career, Carl has maintained a strong commitment to team development and mentorship, fostering an environment of collaboration and growth. His leadership and dedication to SDC’s long-term success have cemented his reputation as a key figure within the company.

Sam O’Neill

Sam O’Neill

Project Manager

Sam’s career in construction began with comprehensive training at a Main UK contractor, where he progressed from Trainee Building Manager to Senior Building Manager. In 2016, seeking to develop his knowledge, Sam moved to the Middle East, gaining invaluable experience working on high-end apartment complexes in Oman and private villas in Dubai. His international experience refined his skills and expanded his perspective on large-scale projects. Upon returning to the UK, Sam joined SDC in 2022 and quickly immersed himself in his first major project—delivering multi-tenant office and laboratory spaces on a busy, occupied campus. As a Project Manager, Sam is a conscientious and diligent member of the team who ensures that each stage of the project is completed to the highest standard. In 2021, Sam was awarded the CIOB Silver Medal for ‘Construction Manager of the Year’.
Rory Allan

Rory Allan

Construction Manager

Mark O’Leary

Mark O’Leary

Commercial Manager

Mark is an experienced construction professional who joined SDC in 2016. With a comprehensive understanding of the construction process, he takes charge of managing the pre-construction phase, ensuring that every project is set up for success from the very beginning. Mark oversees the entire cost control process, closely monitoring budgets and ensuring that projects remain financially on track from the tender stage through to project completion. Over the course of his career at SDC, Mark has made significant contributions to a wide range of prestigious projects, many of which are associated with high-profile institutions such as the University of Cambridge. His involvement in these projects highlights SDC’s commitment to delivering exceptional results while also fostering long-term, collaborative relationships with clients.

Costa Tauchira

Costa Tauchira

Senior Quantity Surveyor

Hywel Davies

Hywel Davies

Design Coordinator

Peter Boundy

Peter Boundy

Senior Design Coordinator