Projects
Creating inspiring spaces through innovative design and construction
Merlin Place
This ongoing project involves the is the design, demolition of existing buildings and new build of the scheme known as Merlin Place.
The Optic
The Optic’ provides 95,000 sq ft of flexible workspace and state-of-the-art laboratories, adjacent to the recently completed ARM HQ building.
Project Zeta
One of the UK’s leading science and innovation campuses, and home to over 200 global organisations.
Babraham R&D 2B
Babraham R&2B provides a dynamic environment where discovery and research come together.
1000 Discovery Drive
A versatile five-storey multi-occupancy structure, offering approximately 105,000 square feet of office and B1(b) laboratory space within the Cambridge Biomedical Campus.
Whittle Lab
The New Whittle Laboratory, a £58 million facility, will be the leading global centre for net-zero aviation and energy.
NIAB Park Farm, Barns 1 & 2
Barns 1 and 2 for NIAB are designed to provide a mixture of laboratories, offices, and controlled sporeproof growth rooms.
Project Hadar
Project Hadar involved the refurbishment and re-configuration of the four-storey Gleeson building in Cambridge.
The Welding Institute
A comprehensive redevelopment of The Welding Institute’s site to create a series of new structures connected to the main Bevan Braithwaite building via a link street.
Babraham R&D 2
The Babraham Research Campus aims to be one of the leading centres for bioscience excellence.
Barton House
The construction of Barton House provides Abingdon Science Park with a new laboratory and office building.
Civil Engineering Building
This project involved the construction of a three storey building for the Civil Engineering department at the west Cambridge campus.